suresiteEquity Development Strategies LLC Bid Takeoff Workbooks
suresite
Send your set. Get the takeoff back done.
The bid date doesn’t move, and the takeoff is what eats the window.
Send the link to your documents and the file comes back with every quantity already
in it — so the days you have left go on pricing instead of measuring.
Any owner, any trade, any state. Your rates, your burdens, your markups,
your sub quotes. No macros, no login, no subscription.
This used to be a list of jobs we had chosen. It is now the other way
round: you send the set you are actually bidding and the workbook is built
against it. Public or private, any owner, anywhere — if the documents exist,
they can be measured.
DASNY · CUNY · SCA · DDC · NYCHA · Port Authority · MTA · and whoever issued yours
Every quantity is already in the file. What is never in it is a number
telling you what to bid — if you want that, it is the full estimate below.
What you open on day one
Every scope line, with its quantity, unit, drawing source and specification
reference — the whole issued set, not a sample of it.
The Owner’s scope tables checked against the drawings, with every
disagreement written out in plain language on its own tab.
Prevailing wage rates for the job’s county, already loaded, and every
one of them yours to change.
A trade selector, so your subs see only their own lines and you see all of them.
A qualifications and RFI tab you can send to the Owner as written.
What it deliberately is not
Not an estimate. No rate, no markup, no total — not one dollar
figure anywhere in the file. You know your own costs better than we do.
Not a substitute for reading the set. It gets you to your own questions
faster; it does not answer them for you.
Not exclusive. Anyone on your bid list can buy the same file, and we
never disclose who has.
Two ways to buy it
Same reading, same measuring, same checks. The difference is whether the
number at the end is yours to build or ours to hand you.
Takeoff — you price it
Every quantity, measured and cited to the sheet and the specification
section it came from.
Your rates, burdens, markups and sub quotes go in the yellow cells.
Not one dollar figure anywhere in the file. No rate, no markup, no total.
On the catalog the day it is built, ready to download.
Full estimate — priced for you
Everything above, plus the number — the complete budget, built the
way a hard-dollar bid budget gets built.
Wages off the governing NYSDOL schedule for your county, every rate benchmarked
against a stated market band.
Staff, general conditions and mobilisation priced as build-ups, not plugs.
Ten to fifteen business days from the day the set arrives.
What your set costs
Set by one number you can count yourself in about a minute:
drawing sheets plus specification sections. Both are printed on your drawing
index and your Table of Contents. Move the slider to your set and all three prices
move with it.
Your price
No quote to wait for. Count your index, read your number.
MY SET: 137 DOCUMENTS
20400+
$1,950takeoff, general contractor
Single trade $1,375
· full estimate $3,500
· tier Standard set
· 8 business days
equitydevelopmentstrategiesllc@gmail.com
Nothing owed until the price is agreed
How the number is set
Three tiers, no hourly billing, no change orders. The tier is fixed
the moment you send the link — before any work starts. Prices shown are for
the general contractor takeoff; the table below carries all three products.
Compact setUp to 75 documents$1,150
Standard set76 to 200 documents$1,950
Large set201 to 400 documents$3,000
Above 400 documents, quoted before any work starts. Bid date inside five business days? Say so — you get the specification sweep on its own rather than nothing.
All three products, every set size
Your set
Takeoff, single trade
Takeoff, general contractor
Full estimate
Up to 75 documents
$825
$1,150
$2,100
76 to 200 documents
$1,375
$1,950
$3,500
201 to 400 documents
$2,150
$3,000
$5,500
A single-trade takeoff is the same full read of the
whole set — every drawing, every specification section — with your trade
measured out of it. It is not a cheaper partial read, which is why it sits above the
Bid Document Risk Review rather than below it.
What lands in your inbox
Three files, on both products. A spreadsheet on its own leaves you trusting
numbers you cannot trace, so it never ships alone.
The workbookLive formulas throughout, one Excel file, no macros. Every line
carries the drawing sheet and specification section it came from.
The basis documentA PDF in ten numbered sections: what was read, what was
measured and off which sheet, what is assumed, what is excluded, and the open
questions worth an RFI. On the takeoff it carries no money — it is a basis of
quantities, not a basis of bid.
The transmittalOne email that says what changed, what moved and why, so you
can forward it to your team without writing a summary first.
How you get it
Three steps. Nothing to install, nothing to subscribe to.
Send the link to your setA plan-room, Dropbox or Drive link is easiest
— bid sets run to hundreds of megabytes. Drawings, the project manual, every
addendum issued, and your bid date.
Take it or hand it overDownload the takeoff and price it yourself
— from $825 for your trade,
$1,150 as GC — or send the set and get the
full estimate back priced.
Put your numbers inSet your wages, burdens and markups, drop in your sub
quotes, exclude what you are not carrying. Live formulas throughout.
What is done before you open it
Counted on the College of Staten Island cupola, lantern and skylight job.
This is the work that is off your desk on day one of the window.
1,119Pages you don’t have to read
152Quantities already in the file
56Spec sections already mapped
79Owner scope items already checked
Send your set
A link to the documents and your bid date is enough to start. Your tier is
confirmed the same day, against the actual sheet and section counts — before any
work starts, and nothing is owed until the price is agreed.
Send your set. Get the takeoff back done.
Take the quantities and price them yourself, or send the set and get the whole budget
back priced. Either way the window goes on pricing instead of measuring. If what you
need is the list of everything the documents leave open rather than the
quantities already in them, that is the Bid Document Risk Review instead.